Wednesday 3 December 2003

Wales Millennium Centre - Cardiff
We supplied and installed the complete internal hot water temperature maintenance system as well as the under floor heating to two exposed balcony areas, each 10 square metres to prevent ice formation. The system was controlled by an air sensing thermostat and moisture sensors on the surface floor.

No comments:

Post a Comment