Monday 22 December 2003

Scapa Tape UK Ltd - Ashton Under Lyne 
Supplied 150m of SC20/2 heating tape in order to temperature maintain pipework containing Bitumen at +140°C.

Friday 19 December 2003

Coldstone Quarry - Harrogate
Designed, supplied and installed a hopper door heater 600w 1520mm x 400mm 110v.

Tuesday 16 December 2003

Experian Project - Ruddington
Our project scope was to extend the sprinkler pipework trace heating and to also frost protect the chilled water pipework cooling towers 1 & 2.

Monday 15 December 2003

AHC Warehousing Ltd - Widnes
Supplied and installed trace heating and thermal insulation to frost protect the roof and racking sprinkler pipework, just under 1000m of heating tape used in total.

Friday 12 December 2003

Welcome Trust Building - Cardiff
Trace heated two heating zones for the domestic and lab hot water systems utilising our H2OWAT55 heating tape complete with connectors and ancillary equipment.

Thursday 11 December 2003

Russells Hall Hospital - Dudley


Here we frost protected the external chiller flow and return pipework, boosted cold water and salt cold water pipework all on the mortuary roof.

Wednesday 10 December 2003

Precision Antennas LTD - Stratford Upon Avon
ESH designed and installed 5 x 1.8/2.2m edge panels and centre panels to be fitted onto the back of a Satellite Receiving Dish Aerial.

Tuesday 9 December 2003

Andrew Corporation - USA
This was a busy year for Andrew Corp and ESH were asked once again to design and supply 32 x 3.7m dish heater panels.

Friday 5 December 2003

Lafarge Cement - Westbury
Designed and supplied a mains heating jacket 1452W 110V.
Bedford Hospital
Supplied H2OWAT55 self regulating heating tape for the temperature maintenance of the hot water services pipework.

Wednesday 3 December 2003

Wales Millennium Centre - Cardiff
We supplied and installed the complete internal hot water temperature maintenance system as well as the under floor heating to two exposed balcony areas, each 10 square metres to prevent ice formation. The system was controlled by an air sensing thermostat and moisture sensors on the surface floor.
JSD Blackhorse Way - Horsham 
Supplied and installed a frost protection trace heating system using self limited tape to multiple cold water pipework throughout the site. Over 300m of tape installed in total.

Tuesday 2 December 2003

Acordis Acetate Products - Coventry
Supplied and installed TRACECO-W-65 240V self limiting tape ATEXV certified for use in hazardous areas to 65m of pipework. The system was to maintain 55°C.

Monday 1 December 2003

Hodder WTW 
Supplied and installed a trace heating system to two tanks to maintain a minimum temperature of +10°C in a minimum ambient of -10°C.

Friday 28 November 2003

Unite Student Accommodation - Birmingham
Supplied 500m of H2OWAT55 to Carillion for this large building providing accommodation for 743 students.
Dewsbury Dyeing Company LTD
Supplied and installed trace heating and thermal insulation to 100mm and 50mm oil line plastic pipework.

Thursday 27 November 2003

Moor Street Car Park - Birmingham 
Supplied and installed a trace heating system to provide frost protection to the water pipework within the car park area.

Wednesday 26 November 2003

Warwick University - Bio Technology Lab
The project scope was to frost protect the trench pipework and also to temperature maintain the hot water system from the roof plantroom.

Tuesday 25 November 2003

Heath Hospital - Cardiff
For our second visit to Heath Hospital, ESH supplied and installed a trace heating system to provide frost protection to an external oil line situated on top of the BSU roof.

Friday 21 November 2003

ASDA Store - Skelmersdale 
Supply of VC trace heating tape to frost protect the whorehouse sprinkler system.

Thursday 20 November 2003

Airbus UK - Manchester 
Trace heating was supplied and installed to frost protect the pipework carrying supply water from the external sprinkler tank.

Wednesday 12 November 2003

Ninewells Hospital - Dundee 
Frost protected 6 different pipe sections of 8m each, to maintain 3°C in a minimum ambient of -15°C.

Friday 7 November 2003

Heath Hospital - Cardiff
Supplied and installed the frost protection and temperature maintenance systems within the hospitals welcome building.

Wednesday 5 November 2003

Andrew Ltd - USA
These 32 x 4.6m dish heater panels were designed and supplied for the provision of frost protecting Satellite Receiving Dish Aerials over in America. Within the same week we also shipped out a further 32 x 3.7m dish heater panels for the launch of a new US satellite channel. 

Thursday 30 October 2003

M&S Store - Macclesfield 
Supplied 50m of H2OWAT65 to provide temperature maintenance to this new M&S store.

Wednesday 29 October 2003

Midland Press - Birmingham
Supplied and installed a trace heating system to the chiller pipework and the external mains cold water pipework. Overall this job needed 530m of heating tape in total.

Wednesday 22 October 2003

ACS & T Humberside - Grimsby
Designed and supplied 6 x drip tray heaters complete with cold lead for this food logistics company.

Monday 20 October 2003

Gill Insulation Eastern LTD - Nottingham
Supplied and installed a trace heating system to provide frost protection to the generator sprinkler pipework and mains water storage tank pipework.

Monday 13 October 2003

Kingspan Insulation Ltd - Leominster
Temperature maintain a polyethylene tank at 25°C and the associated pipework. Overall ESH supplied and installed 280m of FBTBOJ heating tape.

Wednesday 8 October 2003

ABB Ltd - Stinehouse
ESH designed, supplied and installed two electric heating jacket systems for 36" Guest & Chrimes sluice valves. Each system comprised of 5 individual jackets which were designed to fit together to protect against frost and freezing.

Tuesday 7 October 2003

Peal Lake Leisure Park - Hereford
Supplied 200m of VCB constant wattage tape to this project.

Monday 6 October 2003

Specialist Computer Centre - Tyseley
Supplied and installed a trace heating system and weatherproof lagging to frost protect the canopy sprinkler pipework.

Tuesday 30 September 2003

Thermetica Ltd - Chester
ESH designed and supplied 2 x AGS aluminium heating panel 355 x 175mm 240v 100w.

Wednesday 24 September 2003

Robinson Healthcare - Nottingham 
Provided frost protection to 26m of external pipework.
Mawdsleys Ltd - Waterwells
Designed and supplied 12 x HZIGS1700 tapes, 1700MM long 140w 240v.

Friday 19 September 2003

Selly Oak Hospital - Birmingham
Supplied 170m of VC Constant Wattage tape for a frost protection system within this Birmingham based hospital.  
Express Electrical Equipment - Cottingham
Designed and supplied 8 x sets of AGS mats for hopper heating.

Tuesday 9 September 2003

Kingspan Insulation LTD - Leominster
This project consisted of supply and installation of trace heating to pipework for a MDI Tank and two Polyol Tanks to maintain 25°C.

Wednesday 3 September 2003

Penrith WTW
Supply and installation of a trace heating system to provide temperature maintenance to two 3m x 3.8m high tanks.

Monday 1 September 2003

HTD Heat Trace Inc - USA
ESH designed and supplied 8 X 21 inch beam tube heating jackets for this New Jersey based company.

Thursday 28 August 2003

Andrew Ltd - Fife
For this our second order from Andrew Ltd this month, we designed and supplied 16 x 3.6m and 72 x 2.4m Antenna heating panels & 4 x 3.6m and 24 x 2.4m centre heater panels.

Monday 25 August 2003

Cray Valley Ltd - Grimsby
For the use on coconut oil storage, ESH supplied materials to maintain NB steel pipe at 55°C in an hazardous zone 1 area, using both mineral insulated heating circuits and constant wattage heating tape.

Thursday 21 August 2003

Horizon House - Wolverhampton
Supplied and installed a frost protection system to the roof mounted BCW pipework within this drug & substance abuse centre.

Monday 18 August 2003

Corbett Hospital - Dudley
Supply and installation of a trace heating system to provide frost protection to the cold water pipework. 130m of heating tape used on this job.

Thursday 14 August 2003

British Nuclear Fuels
This was an interesting project to design 4 heated transport cases, suitable for carrying 20 x 500ml plastic bottles, containing 6M Nitric Acid. The maintained temperature required was 40°C.

Thursday 7 August 2003

Merton Schools Project
This was a large project involving six different schools. ESH supplied and installed H20WAT65 heating tape and controller type DHB330F to provide a disinfection facility on the hot water system against Legionella. The school involved in the Merton schools project were - Mitcham Vale, Richards Lodge, Rutlish Manor, Raynes Park, Bishopsford and Tamworth school.

Wednesday 6 August 2003

Longham Treatment Works
ESH supplied FBTBOJ self regulating heating tape to perform the duty of Frost Protection.

Wednesday 30 July 2003

Corbett Hospital - Dudley
ESH supplied and installed 130m of trace heating to provide a frost protection system for the external cold water pipework. 

Tuesday 22 July 2003

Grasmere WTW - Cumbria
Supply and installation of a trace heating system on a 2.4m x 2.4m high tank to provide temperature maintenance of +10°C in a minimum ambient of -15°C.

Wednesday 9 July 2003

Mary Lyon Centre - Harewell
Supplied and installed trace heating for frost protection to the hot and cold water service pipes within this research facility.  

Tuesday 24 June 2003

Lakeside Development - Warwick University

Supplied and installed Trace Heating to the hot water service pipework in the west court. The Lakeside student accommodation project used over 700m of heating tape.

Wednesday 18 June 2003

Antenna Heater Panels - Fife
ESH designed and supplied heater panels designed to fit to the rear of Satellite Receiving Dish Aerials to prevent ice formation. 42 individual 2.4m antenna heater panels and 14, 2.4m centre heating panels were supplied in total.