Wednesday 30 July 2003

Corbett Hospital - Dudley
ESH supplied and installed 130m of trace heating to provide a frost protection system for the external cold water pipework. 

Tuesday 22 July 2003

Grasmere WTW - Cumbria
Supply and installation of a trace heating system on a 2.4m x 2.4m high tank to provide temperature maintenance of +10°C in a minimum ambient of -15°C.

Wednesday 9 July 2003

Mary Lyon Centre - Harewell
Supplied and installed trace heating for frost protection to the hot and cold water service pipes within this research facility.