Monday 22 December 2003

Scapa Tape UK Ltd - Ashton Under Lyne 
Supplied 150m of SC20/2 heating tape in order to temperature maintain pipework containing Bitumen at +140°C.

Friday 19 December 2003

Coldstone Quarry - Harrogate
Designed, supplied and installed a hopper door heater 600w 1520mm x 400mm 110v.

Tuesday 16 December 2003

Experian Project - Ruddington
Our project scope was to extend the sprinkler pipework trace heating and to also frost protect the chilled water pipework cooling towers 1 & 2.

Monday 15 December 2003

AHC Warehousing Ltd - Widnes
Supplied and installed trace heating and thermal insulation to frost protect the roof and racking sprinkler pipework, just under 1000m of heating tape used in total.

Friday 12 December 2003

Welcome Trust Building - Cardiff
Trace heated two heating zones for the domestic and lab hot water systems utilising our H2OWAT55 heating tape complete with connectors and ancillary equipment.

Thursday 11 December 2003

Russells Hall Hospital - Dudley


Here we frost protected the external chiller flow and return pipework, boosted cold water and salt cold water pipework all on the mortuary roof.

Wednesday 10 December 2003

Precision Antennas LTD - Stratford Upon Avon
ESH designed and installed 5 x 1.8/2.2m edge panels and centre panels to be fitted onto the back of a Satellite Receiving Dish Aerial.

Tuesday 9 December 2003

Andrew Corporation - USA
This was a busy year for Andrew Corp and ESH were asked once again to design and supply 32 x 3.7m dish heater panels.

Friday 5 December 2003

Lafarge Cement - Westbury
Designed and supplied a mains heating jacket 1452W 110V.
Bedford Hospital
Supplied H2OWAT55 self regulating heating tape for the temperature maintenance of the hot water services pipework.

Wednesday 3 December 2003

Wales Millennium Centre - Cardiff
We supplied and installed the complete internal hot water temperature maintenance system as well as the under floor heating to two exposed balcony areas, each 10 square metres to prevent ice formation. The system was controlled by an air sensing thermostat and moisture sensors on the surface floor.
JSD Blackhorse Way - Horsham 
Supplied and installed a frost protection trace heating system using self limited tape to multiple cold water pipework throughout the site. Over 300m of tape installed in total.

Tuesday 2 December 2003

Acordis Acetate Products - Coventry
Supplied and installed TRACECO-W-65 240V self limiting tape ATEXV certified for use in hazardous areas to 65m of pipework. The system was to maintain 55°C.

Monday 1 December 2003

Hodder WTW 
Supplied and installed a trace heating system to two tanks to maintain a minimum temperature of +10°C in a minimum ambient of -10°C.