Thursday 30 October 2003

M&S Store - Macclesfield 
Supplied 50m of H2OWAT65 to provide temperature maintenance to this new M&S store.

Wednesday 29 October 2003

Midland Press - Birmingham
Supplied and installed a trace heating system to the chiller pipework and the external mains cold water pipework. Overall this job needed 530m of heating tape in total.

Wednesday 22 October 2003

ACS & T Humberside - Grimsby
Designed and supplied 6 x drip tray heaters complete with cold lead for this food logistics company.

Monday 20 October 2003

Gill Insulation Eastern LTD - Nottingham
Supplied and installed a trace heating system to provide frost protection to the generator sprinkler pipework and mains water storage tank pipework.

Monday 13 October 2003

Kingspan Insulation Ltd - Leominster
Temperature maintain a polyethylene tank at 25°C and the associated pipework. Overall ESH supplied and installed 280m of FBTBOJ heating tape.

Wednesday 8 October 2003

ABB Ltd - Stinehouse
ESH designed, supplied and installed two electric heating jacket systems for 36" Guest & Chrimes sluice valves. Each system comprised of 5 individual jackets which were designed to fit together to protect against frost and freezing.

Tuesday 7 October 2003

Peal Lake Leisure Park - Hereford
Supplied 200m of VCB constant wattage tape to this project.

Monday 6 October 2003

Specialist Computer Centre - Tyseley
Supplied and installed a trace heating system and weatherproof lagging to frost protect the canopy sprinkler pipework.